100 sq ft · Concrete quantity guide
How Much Concrete for a 10×10 Slab?
A 10 ft × 10 ft slab at 4 inches thick needs 1.23 cubic yards before waste. With a 10% allowance, plan for 1.36 cubic yards or 62 bags of 80 lb concrete mix.
At a glance · 4-inch thickness · 10% waste allowance
- Concrete volume
- 1.36 yd³
- Using 80 lb bags
- 62 bags
- Using 60 lb bags
- 82 bags
Bag counts are alternative ways to supply the same volume. Ready-mix suppliers may bill a different quantity because of minimum orders or delivery increments.
Adjust your estimate
10×10 Concrete Slab Calculator
Your 10 × 10 ft slab
100 sq ft footprint. Choose your specified thickness and allowance.
10% is the example allowance used in the tables below. Thickness choices compare quantities; use the thickness specified for your project.
Compare bags vs. ready-mix costsKeeps your thickness and waste allowance. Add local prices and delivery fees in the full calculator.
10 × 10 ft · 4 in thick
Includes 10% waste allowance; 1.23 yd³ before waste.
Choose one bag size. Each count supplies the full volume and is rounded up to whole bags. Check the yield on your product label.
10×10 slab quantities at 4, 5, and 6 inches
All rows use a 100 sq ft footprint. The allowance column adds 10% once; every bag count includes that same allowance. Values are calculated before rounding for display.
| Thickness | Before waste | With 10% waste | Compare costs |
|---|---|---|---|
| 4 inches | 1.23 yd³ | 1.36 yd³ | 4-inch estimate → |
| 5 inches | 1.54 yd³ | 1.70 yd³ | 5-inch estimate → |
| 6 inches | 1.85 yd³ | 2.04 yd³ | 6-inch estimate → |
How many bags of concrete for a 10×10 slab?
| Thickness | 40 lb bags | 50 lb bags | 60 lb bags | 80 lb bags |
|---|---|---|---|---|
| 4 inches | 123 | 98 | 82 | 62 |
| 5 inches | 153 | 123 | 102 | 77 |
| 6 inches | 184 | 147 | 123 | 92 |
Approximate yields: 40 lb = 0.30 ft³, 50 lb = 0.375 ft³, 60 lb = 0.45 ft³, 80 lb = 0.60 ft³. Use complete concrete mix, not cement alone. For another volume, use the concrete bag calculator.
How the 4-inch estimate is calculated
1. Convert thickness to feet
4 ÷ 12 = ⅓ ft. Multiply 10 × 10 × ⅓ to get 33.33 ft³ before waste.
2. Add the allowance once
33.33… × 1.10 = 36.67 ft³. Divide by 27 to get 1.358… yd³, displayed as 1.36 yd³.
3. Round up whole bags
36.666… ÷ 0.60 = 61.111… bags. Round up to 62 bags of 80 lb mix. Do not add another 10% to this count.
Bags or ready-mix for this 10×10 slab?
Compare your actual quotes
A low ready-mix price per yard can be offset by delivery or short-load fees. Bags also involve handling and mixing: 62 bags at 80 lb total 4,960 lb of packaged dry mix. Plan delivery and mixing capacity as well as material price.
Enter your prices in the slab calculator →Illustrative cost comparison
4 inches thick, 10% allowance. Example prices only.
- 62 × 80 lb bags at $6 each
- $372.00
- Ready-mix at $150/yd³
- $203.70
- Ready-mix plus a $200 fee
- $403.70
Bag fees assumed $0. Uses unrounded volume; no supplier minimum or delivery increment applied. Excludes labor, equipment, taxes, base preparation, and reinforcement.
Turn the estimate into an order
Working with a longer pad? See the 10×12 slab guide for 120 sq ft quantities, supplier order examples and base extensions.
Need the aggregate base too? Use the gravel under concrete slab calculator with this 10×10 footprint. Enter the base’s own compacted depth and include any extension beyond the slab.
- Confirm the footprint and specified thickness. Thickened edges or separate footings need additional volume.
- Tell the supplier the calculated volume including your allowance. Ask for the actual billable quantity, minimum order, delivery increment, and all delivery or short-load fees.
- For bagged mix, verify the yield on the exact product and choose one bag size. The counts above already include whole-bag rounding.
For other dimensions, use the Concrete Slab Calculator. For a broader budget with entered labor costs, use the Concrete Cost Calculator.
10×10 concrete slab questions
How many yards of concrete do I need for a 10x10 slab?
At 4 inches thick, a 10 ft by 10 ft slab needs 1.23 cubic yards before waste, or 1.36 cubic yards with a 10% allowance. At 5 and 6 inches, the totals including that allowance are 1.70 and 2.04 cubic yards. Supplier minimums and delivery increments are separate.
How many 80 lb bags do I need for a 10x10 slab?
With 10% waste and a yield of 0.60 cubic feet per bag, buy 62 bags for 4 inches, 77 bags for 5 inches, or 92 bags for 6 inches. Without the allowance, the 4-inch slab needs 56 bags. Round the final bag count up, and verify your product's yield.
How many 60 lb bags do I need for a 10x10 slab?
At a yield of 0.45 cubic feet per bag and with 10% waste, a 10x10 slab needs 82 bags at 4 inches, 102 at 5 inches, or 123 at 6 inches. These are alternatives to the other bag sizes, not quantities to add together.
How much does the concrete for a 10x10 slab cost?
Multiply the whole-bag count by your bag price, or the unrounded waste-adjusted cubic yards by your ready-mix price, then add applicable fees. For the 4-inch, 10% allowance example, 62 bags at an example $6 each cost $372 before fees. This is a material example, not an installed slab quote.
Is 4 inches thick enough for my slab?
This calculator estimates quantities for a specified thickness; it does not select a structural design. Use the thickness, reinforcement, and base requirements from your project plans or qualified local professional. The 4, 5, and 6-inch choices are calculation examples.
Does concrete mix mean the same thing as cement?
No. These bag counts are for complete concrete mix containing cement and aggregates. Bags of Portland cement alone do not have the same yield and cannot be substituted into this estimate.
Calculation basis & source
Volume uses length × width × thickness, with 27 cubic feet per cubic yard. Bag yields follow the approximate values in the QUIKRETE Concrete Mix No. 1101 data sheet. Other products can differ. The 10% allowance and prices shown here are explicit example inputs.